• Prefabrication and erection of piping and execution of the related installation works of mechanical equipment of systems in the predetermined areas, as part of the expansion of the beer production unit/MACEDONIA THRACE BREWERY S.A. • Construction works of a stainless steel 304L vessel 2500x85x700 /MACEDONIA THRACE BREWERY S.A. • Fabrication-Welding-Erection of piping and accessories for the connection of the new oil storage tanks to the existing network/OHONOS SNACKS S.A. • Demounting and Remounting of Valves at Units U-7100, U-7500, U-7600 – General Shut Down Works 2023(EKME S.A.)/MOTOR OIL HΕLLΑS - Corinth Refinery • Piping Works – General Shut Down Works 2023 (EKME S.A.)/MOTOR OIL HΕLLΑS - Corinth Refinery • Piping Works U-3100 – General Shut Down Works 2023(Anelixis P.C.)/MOTOR OIL HΕLLΑS - Corinth Refinery • SULPHUR RECOVERY UNIT 640 - INTERCONNECTING, PROCESS & UTILITIES - Prefabrication and Erection of Pipelines (EKME S.A.)/HELLENIC PETROLEUM - Thessaloniki Industrial Complex • GAS DEHYDRATION UNIT - KARACHAGANAK - Prefabrication and Erection of Skid Modules Pipelines (EKME S.A.) • Blinding and Reinstatement of Vessels and Reactor (EKME S.A.)/MOTOR OIL HΕLLΑS - Corinth Refinery • Naphtha's Line Construction from U-1200 to U-8400/MOTOR OIL HΕLLΑS - Corinth Refinery • Maintenance Sheet Metal Works in Tanks (EKME S.A.)/HELLENIC PETROLEUM -Aspropyrgos Industrial Complex
2023
• Prefabrication and Erection of Pipelines for the Project ‘Construction Works of Networks’(Anelixis P.C.)/Coral - Thessaloniki Industrial Complex • Prefabrication and Erection of Pipelines for the Project ‘Construction Works of Networks’ (Anelixis P.C.)/Coral - Perama Industrial Complex • Piping Prefabrication - Process & Utility Piping - ASSIUT HYDROCRACKING COMPLEX ANOPC (EKME S.A.) • General Maintenance at Facilities of Refinery 2022 (EKME S.A.)/HELLENIC PETROLEUM - Thessaloniki Industrial Complex • Filter and Ducts Insulation Works/KNAUF - Amphilochia Industrial Complex • Piping Prefabrication and Erection of the Northern Corridor Connecting the New Naphtha, Isomerization and CCR units, with the complex (EKME S.A.)/MOTOR OIL HΕLLΑS - Corinth Refinery
2022
• Construction of a natural Gas network for the conversion of the devices of the production line/Skordas Apostolos & Co G.P. • Construction of 2 new stainless vessels from 316 L. steel. /KOLIOS S.A. • Destruction, dismantling and removal of existing vessels at the CIP site of the yogurt department/KOLIOS S.A. • Installation and connection of brine inverter and dismantling of old-Installation and connection of vegan engines with steam air networks- Construction of washing and foaming networks- manufacture of transport carts in the refrigerator and in the packaging/KOLIOS S.A. • Replacement of foam water network piping in the production department of white cheese- Replacement of foam water network piping in the white cheese packaging/KOLIOS S.A. • Steam boiler connection and boiler station works - Construction of 25 carts for halloumi/KOLIOS S.A. • Dismantling - Installation of insulation material on the U-2000 unit and new insulation of alternatives on the U-2100 and U-3200 units during the General Shut Down Works 2020-2021 (ISOPROTECT L.P.)/HELLENIC PETROLEUM -Aspropyrgos Industrial Complex
2021
• Improvement of units U-7500/U-7600 during the shut-down refinery maintenance works 2020/MOTOR OIL HΕLLΑS - Corinth Refinery • Skid and module fabrication works (EKME S.A.)/ Technip Benelux B.V • Cleaning the bottom of tanks in “ECO IX” ship • Piping works/Centracore - Jet oil S.A • Installation – connection and activation of pump station - Construction of stainless chain hoist crane and extension air network/KOLIOS S.A. • Replacement works of piping in CIP system and extension of steam system at white-cheese department /AKFA Factory • Prefabrication and Erection of pipelines of units U2000/2050/550/490 /HELLENIC PETROLEUM -Aspropyrgos Industrial Complex • Completion of air and yogurt piping network/KOLIOS S.A.
2020
• Cleaning the bottom of the tank D7/Melco Petroleum S.A. • Mechanical Piping Works/KOLIOS S.A. • Skid Mounted_Crude Oil Processing Trains, Petronas, Iraq (EKME S.A.)
2019
• Mechanical construction of stainless hot water network and stainless fat network with all the necessary weld materials for the installation & connection of rendering unit/FARM CHITAS S.A., FILIPPIADA. • Mechanical construction of insulated fumes pipe 1400mm/BAGLASS S.A - AIGALEO • Mechanical installation of equipment and construction of 20 m conveyor belt at yoghurt pasteurization unit /KOLIOS S.A.
2018
• Equipment installation - piping erection of the new IQOS production unit • Prefabrication and installation of the T-709 steam coil /MOTOR OIL HΕLLΑS - Corinth Refinery • Construction, placement, support, proofing and paint of the new “network 5” and the maintenance for the firefight project/SYNGENTA HELLAS - Inofita • Cleaning project of tank “T2” in main facilities /OIL ONE - Drapetsona • Prefabrication & erection of pipelines in project “Improvement and restoration of the Fuel Oil-855 circuit”/MOTOR OIL HΕLLΑS - Corinth Refinery • Construction of stainless piping network for the manufacture of “rendering” unit equipment /FARM CHITAS S.A., FILIPPIADA. • Cleaning the hold of groups No2, No3, No4 in “ECOKEEPER” ship • Cleaning of the load space and the tanker truck loading platform in the loading station/AVIN OIL - Korinthos • Project in pipe lines during the refinery maintenance 2017/HELLENIC PETROLEUM -Aspropyrgos Industrial Complex • Erection of steel pipelines and supports in main facilities /Coral - Perama Industrial Complex • Construction of the new exit line RESIDUE M-100 /MOTOR OIL HΕLLΑS - Corinth Refinery • DE-mucking the accumulated solid petroleum residues from the tanks of “ECOMASTER” ship/HELLENIC ENVIROMENTAL CENTER - HEC • Construction of stainless air-conditioner collectors /AGGEMAR S.A. • Construction of two tanks with capacity 125t /BITOUMINA S.A
2017
• Performance of Structural and Mechanical installation for SM packages 2 & 3 - SP2 & SP3 - Main production Building and Filters - Olympias Phase II Project /HELLAS GOLD S.A. • Mechanical support in project “Shop assembled vessels - 2546 polyethylene plant PE3 unit” /UNIPETROL • Manufacture of new pharmaceutical production line and another new ventilation line/SYNGENTA HELLAS - Inofita • Piping prefabrication & erection in units 100, 200, and DODD in refinery /HELLENIC PETROLEUM - Thessaloniki Industrial Complex • Prefabrication & erection of pipelines in units MHC, TMK, U-7100, U-7200 and U-7350 during the shutdown refinery maintenance 2016/MOTOR OIL HΕLLΑS - Corinth Refinery • Erection of 3 tanks and construction of fuel & firefighting channel /ELINOIL – Aspropyrgos • Replacement of main condenser tubes and creation of anti-corrosion protection of duct plates in unit III/PPC – Megalopolis • Mechanical works during Shut-down Works 2016 in U-32, U-34, U-38 and sector 2/HELLENIC PETROLEUM - Elefsina Industrial Complex
2016
• Prefabrication & Erection of Piping Networks/PPC – THIRA •Piping works and Coil Replacement of Incinerator L-3702 A/B during Shut-down Works 2015/HELLENIC PETROLEUM -Aspropyrgos Industrial Complex • Construction of Steam Production Systems/PPC – THIRA • Fuel Gas / Natural Gas Phase 2 /HELLENIC PETROLEUM - Elefsina Industrial Complex • Welding of fireproofing annular rings for storage tanks /HELLENIC PETROLEUM - Elefsina, Aspropyrgos & Megara Industrial Complex • Construction of Cooling Seawater’s Suction Network /PPC – RHODES
2015
• Prefabrication and erection of pipelines and supports of the HALDOR-TOPSOE natural gas network /HELLENIC PETROLEUM - Elefsina Industrial Complex • Turn around works in U-32 (Flexi cocker)/HELLENIC PETROLEUM - Elefsina Industrial Complex • Turn around works in U-100 & U-200 /MOTOR OIL HΕLLΑS - Corinth Refinery
2014
•Procurement and formation works/ EXXON MOBIL REBOTTOMING, Cyprus • Metallic and mechanical works for a hotel upgrade project/Corfu, Greece • Heat exchangers prefabrication for an experimental biodiesel unit/Ioannina, Greece
2013
• Erection of pipelines, supports and steam tracing system/HELLENIC PETROLEUM - Elefsina Industrial Complex
2010-2012
• Erection and welding of steam tracing and manifolds system - ERUP U38 Project/HELLENIC PETROLEUM - Elefsina Industrial Complex • Turn around works 2011 on various Units/HELLENIC PETROLEUM - Thessaloniki Industrial Complex • Turn around works 2011 on various Units /MOTOR OIL HΕLLΑS - Corinth Refinery • Installation of a Ø96’’ pipe line/PPC- Aliveri Unit • Procurement and installation of a vegetable protein production unit – carbon and stainless steel pipes erection and welding, installation of mechanical equipment/ NESTLE, Sparta
2011
• Prefabrication and Erection of pipelines of U-400 και U-900/HELLENIC PETROLEUM- ΟΚΤΑ Industrial Complex • Shut down revamping piping works U-100/300/400/HELLENIC PETROLEUM - Thessaloniki Industrial Complex
2010
• USALDO Unit Revamping Erection Works/HELLENIC PETROLEUM - Thessaloniki Industrial Complex • Revamping and Hazop System application of U-2400/HELLENIC PETROLEUM -Aspropyrgos Industrial Complex • Installation of pipelines/KARAMOLEGOS Industry at Koropi and Bucharest
2009
• Turn around activities of Units III and IV / PPC- Atherinolakos Crete • Replacement of pipelines of FCC during Shut Down Works 2008/MOTOR OIL HΕLLΑS - Corinth Refinery • Erection of equipment, prefabrication and erection of pipelines and supports /ΑLΕΑ ΑVΕGΕΤ SPARTA Food Industry.